Course Number: VEM114
Course Title:
Refrigeration II
STUDENT LEARNING OUTCOMES
General Objective
This course is design to equip individual with operational skills in Air
Conditioning and Refrigeration service to install, service and maintain, trouble
shoot and repair split type air conditioning units.
Specific Objectives
Students
will be able to:
1. select
suitable installation site.
select installation site for
equipment
provide piping installation plan
maximize air distribution
plot site for electric controls and
wiring installation
2. install
split type air conditioning unit.
identify troubles related with the
installation work.
explain the procedures of
installation
demonstrate bringing in of units
discuss safety precautionary measures
for installation
make pipe holes
3. install
system piping.
determine allowable piping length and
level difference
compute actual piping length and
equivalent piping length
connect refrigerant piping
demonstrate leak testing
evacuate air conditioning unit
charge refrigerant in the system
4. connect
electrical system of split type air conditioning unit.
lay-out wiring of split system air
conditioner
install power supply wiring
install controls and protective
devices
determine the sizes of electric wires
discuss the procedures for grounding
work
test run electrical system
5. service
and maintain split type air conditioning unit.
check mechanical components operating
condition.
perform system lubrication
measure refrigerant charge
clean air distribution system
6. troubleshoot
split type air conditioning unit.
discuss troubleshooting decision aid
diagnose system by use of pressure
gauge
explain major troubles with the
refrigeration cycle
determine unit troubles and
countermeasures
7. recover
and recycle refrigerant in split type air conditioning unit.
assess unit for refrigerant
recovery/recycling
demonstrate steps in setting up
recovery/recycling equipment
operate refrigerant
recovery/recycling equipment.
8. repair
and retrofit split type air conditioning unit.
evaluate system condition
explain retrofitting
identify refrigerant
recognize refrigerant cylinder and
color codes
practice safety precautions in
handling refrigerant
9. perform
start up and commissioning.
inspect before test run
perform unit test run
measure operating items
prepare standard operation data
conduct data measurement in
the field